Atlas IIAS | GE 3
GE 3 carries also 24 C-band and 24 Ku-band transponders to provide voice and video communications to North America after parking at 127° W longitude.
Atlas II was a member of the Atlas family of launch vehicles, which evolved from the successful Atlas missile program of the 1950s. It was designed to launch payloads into low earth orbit, geosynchronous transfer orbit or geosynchronous orbit. Sixty-three launches of the Atlas II, IIA and IIAS models were carried out between 1991 and 2004; all sixty-three launches were successes, making the Atlas II the most reliable launch system in history.
When is the Atlas IIAS | GE 3 launch?
What rocket is being used for GE 3?
Where is the Atlas IIAS | GE 3 launching from?
What orbit is GE 3 going to?
Who is launching GE 3?
Can I watch the Atlas IIAS | GE 3 launch live?
Mission Profile
GE 3 was a Atlas IIAS mission operated by Lockheed Martin that lifted off from Launch Complex 36A, Cape Canaveral SFS, FL, USA on September 4, 1997. The flight carried its payload on a communications mission to Geostationary Orbit. The launch was a success.
